|
|
|
GEOSS AIP-3 Achievements (Videos & Engineering Report)
Last modified:
11/29/2010 09:30 AM
GEOSS Architecture Implementation Pilot Phase-3 Achievements:
"Fostering interoperability arrangements and common practices for GEOSS" The AIP Task develops and pilots new processes and infrastructure components for GEOSS Common Infrastruture (GCI) and the broader GEOSS architecture. The material presented here shows the status of AIP and the broader GEOSS architecture developments as of the GEO-VII Plenary and Ministerial, November 2010. |
|
Hosted by Center for Energy and Processes of Ecole des Mines de Paris -This site is powered by Zope,CPS, which includes CPSSkins. |